TECHMAR
  • About Us
  • Marine
  • Chemical Food & Beverage Marine Oil & Gas
  • PRODUCTS
  • SERVICES
  • Technical
  • FAQs
  • Contact
  • Sign In My Account
TECHMAR
  • About Us/
  • Chockfast/
    • Marine
  • OUR INDUSTRIES/
    • Chemical
    • Food & Beverage
    • Marine
    • Oil & Gas
  • PRODUCTS/
  • SERVICES/
  • Technical/
  • FAQs/
  • Contact/
  • Sign InMy Account
5254898599_c446ebc474_o.jpg
TECHMAR

FAQs2

TECHMAR
  • About Us/
  • Chockfast/
    • Marine
  • OUR INDUSTRIES/
    • Chemical
    • Food & Beverage
    • Marine
    • Oil & Gas
  • PRODUCTS/
  • SERVICES/
  • Technical/
  • FAQs/
  • Contact/
  • Sign InMy Account
August 02, 2016

Why use epoxy grout?

August 02, 2016/ Ken Gerdes

Epoxy grout has excellent adhesion properties to both concrete and steel. Epoxy grout is the only equipment setting material with the ability to resist vertical, horizontal, and axial forces.

Back to FAQs
August 02, 2016/ Ken Gerdes/
Vibration, FAQs
vibration, epoxy grout, concrete, resist, axial, forces

Ken Gerdes

August 02, 2016

What is a monolithic structure?

August 02, 2016/ Ken Gerdes

A monolithic structure is one that operates as a whole.  When epoxy grout is placed between concrete and a steel base plate, a monolithic structure is formed.

Back to FAQs
August 02, 2016/ Ken Gerdes/
Vibration, FAQs
vibration, monolithic, structure, epoxy, grout, steel, base, plate, concrete

Ken Gerdes

August 02, 2016

Can vibration jump a cold joint in concrete?

August 02, 2016/ Ken Gerdes

Vibration cannot jump or transfer across a cold joint in concrete.

Back to FAQs
August 02, 2016/ Ken Gerdes/
Vibration, FAQs
vibration, jump, cold, concrete

Ken Gerdes

August 02, 2016

How soon can I set equipment after concrete is poured?

August 02, 2016/ Ken Gerdes

Concrete needs to be completely hydrated which is typically 28 days with standard concrete.  Concrete could be hydrated faster than 28 days but would need to be tested to verify full hydration.

Learn More
August 02, 2016/ Ken Gerdes/
FAQs, Foundation
foundation, set, equipment, pour, concrete, hydrate, 28

Ken Gerdes

August 02, 2016

How soon can I pour grout equipment?

August 02, 2016/ Ken Gerdes

Assuming the concrete is properly cured, grout can be poured after all concrete laitance is removed.

Back to FAQs
August 02, 2016/ Ken Gerdes/
FAQs, Foundation
foundation, grout, equipment, concrete, pour, cured, laitance, remove

Ken Gerdes

August 02, 2016

How do I prepare my concrete foundation for grout?

August 02, 2016/ Ken Gerdes

A concrete foundation should be prepared for grout by removing all laitance with a chipping hamper with a chisel bit.

Back to FAQs
August 02, 2016/ Ken Gerdes/
FAQs, Foundation
foundation, prepare, grout, concrete, remove, laitance, chipping, hammer, chisel

Ken Gerdes

August 02, 2016

What strength of concrete should my foundation be?

August 02, 2016/ Ken Gerdes

All concrete should have a minimum compressive strength of 4000 psi at 28 days.

Back to FAQs
August 02, 2016/ Ken Gerdes/
FAQs, Foundation
foundation, what, strength, concrete, 4000, psi, 28, days

Ken Gerdes

August 02, 2016

How do I prepare my concrete foundation for grouting?

August 02, 2016/ Ken Gerdes

Remove all laitance with a chipping hammer.
Make sure the concrete is properly hydrated.
Be sure the concrete is free of any oil or contaminants.

Back to FAQs
August 02, 2016/ Ken Gerdes/
FAQs, Foundation
foundation, prepare, concrete, how, grout, remove, chipping, hammer, hydrate, fee, oil, contaminants

Ken Gerdes

August 02, 2016

Can my equipment foundation be multiple pours of concrete?

August 02, 2016/ Ken Gerdes

Multiple concrete pours are not recommended as there will be a cold joint between pours and vibration will not transfer across a cold joint.

Back to FAQs
August 02, 2016/ Ken Gerdes/
FAQs, Foundation
foundation, pours, concrete, multiple, cold, joint, vibration

Ken Gerdes

August 02, 2016

Can I use a high early concrete mixture for my foundation?

August 02, 2016/ Ken Gerdes

A high early concrete should only be used with the approval of the equipment user.  Consider the use of Gill 33 for quick compressive strength and hydration.

Back to FAQs
August 02, 2016/ Ken Gerdes/
FAQs, Foundation
foundation, high, concrete, mix, mixture, Gill 33, strength

Ken Gerdes

August 02, 2016

If there is contamination on an existing foundation can I grout over it?

August 02, 2016/ Ken Gerdes

All existing foundation contamination must be removed by removing the concrete that is contaminated prior to grouting.

Back to FAQs
August 02, 2016/ Ken Gerdes/
Foundation, FAQs
foundation, contamination, remove, removing, concrete

Ken Gerdes

August 02, 2016

Does the expansion joint need to extend into the concrete foundation?

August 02, 2016/ Ken Gerdes

The expansion joint is generally installed on top of the concrete foundation and below the base plate within the area where the epoxy grout will be poured.

Back to FAQs
August 02, 2016/ Ken Gerdes/
FAQs, Expansion Joints
Expansion Joint, extend, concrete, foundation

Ken Gerdes

July 25, 2016

How big should I core holes for anchor bolts in concrete?

July 25, 2016/ Ken Gerdes

When coring holes in a concrete foundation for anchor bolts, the diameter of the core should be 3 times the bolt diameter.

Back to FAQs
July 25, 2016/ Ken Gerdes/
FAQs, Anchor Bolts
anchor, anchor bolts, bolts, how big, core holes, concrete

Ken Gerdes

© TECHMAR 2017

yt_logo_rgb_light.png

Texas Offices: (713) 955-6854
Midwest/Eastern Offices: (630) 663-1802
E: customerservice@techmargrout.com