TECHMAR
  • About Us
  • Marine
  • Chemical Food & Beverage Marine Oil & Gas
  • PRODUCTS
  • SERVICES
  • Technical
  • FAQs
  • Contact
  • Sign In My Account
TECHMAR
  • About Us/
  • Chockfast/
    • Marine
  • OUR INDUSTRIES/
    • Chemical
    • Food & Beverage
    • Marine
    • Oil & Gas
  • PRODUCTS/
  • SERVICES/
  • Technical/
  • FAQs/
  • Contact/
  • Sign InMy Account
5254898599_c446ebc474_o.jpg
TECHMAR

FAQs2

TECHMAR
  • About Us/
  • Chockfast/
    • Marine
  • OUR INDUSTRIES/
    • Chemical
    • Food & Beverage
    • Marine
    • Oil & Gas
  • PRODUCTS/
  • SERVICES/
  • Technical/
  • FAQs/
  • Contact/
  • Sign InMy Account
August 02, 2016

How soon can I set equipment after concrete is poured?

August 02, 2016/ Ken Gerdes

Concrete needs to be completely hydrated which is typically 28 days with standard concrete.  Concrete could be hydrated faster than 28 days but would need to be tested to verify full hydration.

Learn More
August 02, 2016/ Ken Gerdes/
FAQs, Foundation
foundation, set, equipment, pour, concrete, hydrate, 28

Ken Gerdes

August 02, 2016

What strength of concrete should my foundation be?

August 02, 2016/ Ken Gerdes

All concrete should have a minimum compressive strength of 4000 psi at 28 days.

Back to FAQs
August 02, 2016/ Ken Gerdes/
FAQs, Foundation
foundation, what, strength, concrete, 4000, psi, 28, days

Ken Gerdes

© TECHMAR 2017

yt_logo_rgb_light.png

Texas Offices: (713) 955-6854
Midwest/Eastern Offices: (630) 663-1802
E: customerservice@techmargrout.com